Photovoltaics – Completed and Operational Project
The photovoltaic power plant located within the M-Energy energy and industrial complex in Modrany represents a fully operational and technologically advanced source of electricity generation.
Covering an area of approximately 16,000 m², the power plant uses 550 Wp bifacial photovoltaic panels combined with single-axis solar trackers, ensuring efficient utilisation of solar energy throughout the day.
The completed photovoltaic project forms the foundation of the energy infrastructure within the complex while creating opportunities for further development. The combination of advanced technologies, an extensive installation area and significant strategic potential makes the M-Energy complex an important site for renewable electricity generation.
Battery Energy Storage System (BESS) – Approved Project
The approved Battery Energy Storage System (BESS) project represents another key component of the energy infrastructure at the M-Energy complex.
The approved Battery Energy Storage System (BESS) project builds on the existing photovoltaic power plant, creating an integrated solution for more efficient utilisation of generated energy.
The battery storage system enables a flexible response to the needs of the electricity grid and supports the efficient use of generated electricity. The integration of the photovoltaic power plant with the approved BESS project establishes a comprehensive energy infrastructure, offering opportunities for further utilisation in line with the needs of the M-Energy complex.
Construction Waste Crushing and Storage – Opportunities for Further Utilisation and Development of the Site
The development area of the site also offers opportunities for the efficient processing, crushing and temporary storage of inert construction materials and construction waste.
The development area of the site provides space for the handling, sorting and recycling of suitable materials generated by construction activities.
The utilisation of the site can support the principles of the circular economy and promote the efficient management of construction waste. A construction waste crusher, together with spacious storage areas, represents one of the potential uses for part of the complex.
Industrial Halls – Opportunities for Further Utilisation and Development of the Site
The development area, covering approximately 32,000 m², offers a wide range of opportunities for the construction of industrial, manufacturing and warehouse facilities.
The extensive site offers opportunities for light industrial manufacturing, logistics, warehousing, as well as further technological and energy-related projects.
The utilisation of the complex can be flexibly adapted to individual types of operations and projects. The development area provides the potential to establish facilities for a wide range of manufacturing, warehousing, logistics and energy-related activities.